Shipper — Case Study
Schneider supply chain management (SCM) and a building and construction commodities manufacturer and solutions provider
Specific to its building materials and solutions business unit, one of the largest manufacturers and shippers in North America sought to create a fully integrated transportation model built around a common set of consistent, measurable and actionable processes to drive efficiency within its supply chain. The manufacturer’s vision was to establish an order-to-delivery solution to improve distribution and job-site coordination. The company also strove to meet or exceed delivery requirements and keep up with seasonal demand.
Slowdowns in the housing market and related manufacturing industries over the past several years have caused a significant culling of flatbed truck capacity. It has become much more difficult to find trucks that can make specialized, time-sensitive deliveries. The decrease in overall specialized shipping capacity not only created a major constraint during the peak construction season – March through October – but also caused transportation rates to skyrocket. According to the Morgan Stanley Flatbed Market Index, incremental demand for specialized freight services compared with supply during the 2010 and 2011 peak construction seasons was nine times greater than the 2009 busy period. Servicing the commercial and residential construction industry – builders, designers, architects and home/building owners – the leading building materials manufacturer is responsible for delivering its products directly to construction sites. Owing to the lack of receiving docks at these sites, specialty equipment is required to off-load the product.
During the peak construction season, capacity tightens and freight volume can increase by as much as 40 percent, making it difficult for the manufacturer to get products to its customers on time. Dramatic capacity constraints and volume swings such as these demand a proactive and reliable transportation model that meets and exceeds delivery and safety requirements while avoiding premium shipping costs. Struggling to effectively meet seasonal demands, the manufacturer turned to Schneider Supply Chain Management (SCM) for a solution.
Schneider SCM and the building manufacturer collaboratively devised a set of measurable and actionable transportation and scheduling processes to be implemented across the company’s breadth of manufacturing facilities in North America. Those processes included:
Leveraging its expertise and experience in dynamic and challenging job-site deliveries, Schneider SCM was able to improve the customer's delivery service and lower transportation costs through effective specialized transportation capacity management.
Partnering with Schneider SCM helped the building and construction manufacturer achieve many great results, including:
The set of transportation and scheduling processes that Schneider SCM was able to put into place not only led to increased financial results but also provided the leading manufacturer with a competitive edge by enhancing the effectiveness of its supply chain. Through capacity optimization, Schneider SCM was able to work closely with the carrier network to share shipment information and scheduling to create a better balance of deliveries during the peak construction season and all year round.